JUDITH316
350,000-499,999 SparkPoints 459,127
SparkPoints
 

Up-date on Getting There

Tuesday, July 23, 2013

Thanks my friend's for your support and prayers, I got home today from shopping for my granddaughter's birthday gift with a message telling me that the kitchen floor will be replaced with new title installed on August 8 between 8 and 8:30am...I'm so thrilled...Thank you Jesus...

The bedroom carpet is being cleaned the same day floor is being installed...

A lot of work has been done, bedroom closet doors, Bathroom ceiling, walls, floor, ceiling fan, ceiling heating lamp, lighting, wiring, toilet, sink and vanity...

Front Hall Utility floor and walls, door replaced and installed...

Front Hall Cupboard back wall replaced...

What Work Still Needs Doing...

Kitchen Floor being done August 8

Door Frames in hallway, living-room and dining-room and Bedroom Door being replaced week of August 8th... hopefully, still waiting for confirmation

So there you go, gives you a break down of all the work that has been done and what still needs to be completed...

Thanks again for your prayers....
Share This Post With Others
Member Comments About This Blog Post
  • ROZEEROZ1
    Sounds like lots of work is getting down around your place Judith. It will be a relief to have it all done.
    2335 days ago
  • KARRIEMASSOTTI
    Glad to hear about the progress
    2335 days ago
  • AWESOMECHELZ
    Hi again! Sounds great! Did you take photos after the flood? If you did, once the work is done, you can take photos of the completed work and compare them in a blog! How great is that! emoticon
    Love, Chelsea emoticon emoticon
    2335 days ago
  • Add Your Comment to the Blog Post

    Log in to post a comment


    Disclaimer: Weight loss results will vary from person to person. No individual result should be seen as a typical result of following the SparkPeople program.
 

More Blogs by JUDITH316